Use the MWP Project Status window to define the various project status levels for work plans, which are maintained in the Work Plan Data window.
The project status levels defined here are used in the following windows:
- In the Master Work Plan Data window, where it appears in a drop-down list and is assigned to every record in the work plan.
- In the Optimization Analysis window, when a work plan is included in an analysis, then what is included from the work plan can be filtered by project status using the right-click Edit MWP Scope command.